-
Weigh the reward against the level of risk.
衡量回报和风险的等级。
-
"What level of risk can be considered tolerable?
“什么程度的危险能被视为可以容忍?”
-
What level of risk should we be prepared to accept?
我们该准备承受多大的风险?
-
This level of risk can change over time, as new features age.
随着新特性变老,这种级别的风险会随着时间而变更。
-
But each project also has a level of risk associated with it.
但每个项目都会有与其相关的级别的风险。