-
It is designed to take care of complete draft survey needs.
它的设计,以照顾草案完成调查的需要。
-
Draft survey, by draft sensors or manually observed drafts at marks.
草案调查,感应器或手动草案初稿在观察标志。
-
Familiar with draft survey, port handling operation, and shipping operation; 5.
熟悉水尺计重、码头作业及船舶营运。5。熟练运用办公软件。
-
The time spent in connection with the final draft survey is to count as laytime or time on demurrage;
最后的水尺测量损耗的时间计算在装卸货或滞期时间之内;
-
This paper studied the factors in vessel draft survey, and analyzed the reasons of errors, and thus provides the countermeasure to increase precious of draft survey.
分析船舶水尺计重精度的影响因素,给出提高船舶水尺计重精度的对策。