-
Winding short circuit and winding touch chassis ground generally use a multimeter to check;
绕组短路和绕组碰机壳接地一般用万用表即可检查;
-
In many cases the resulting ground screen will be tied to chassis ground at a number of points but it will sometimes be better to join them at a single star point.
不过,某些应用里,还是先把它们接起来然后单点接地(译者疑虑,不一定要接机壳吧)效果更好。
-
Then again, it might be even better to shove the chassis in the ground, leaving the opening exposed for a PC-themed barbecue pit.
再说,这可能是更好地出现在以电脑为主题的烧烤上。
-
Any common-mode current (ICM) that may be present flows from the voltmeter input lo to instrument chassis common, through earth ground to voltage source ground.
可能出现的共模电流(ICM)从电压表的输入低端流到仪器的机箱公共端,经过大地再流到电压源的地。
-
The piers that anchor the house to the ground and the concrete pads on which the chassis sits are constructed on-site, using local labor and conventional construction techniques.
而用来将建筑锚固至地面的基础以及用来放置建筑“底盘”的混凝土平板则可以利用当地传统的技术和劳动力建造。