-
This is the most reliable link test solution for OBSAI interconnects.
这对于OBSAI互连器来说是一个非常可靠的链接解决方案。
-
Link Test tool and signal strength LED display ease the trouble in site installation and debugging.
链接测试工具和信号强度LED显示屏缓和现场安装和调试的麻烦。
-
Operation of a Link Test. The operation is only used to maintain a long connection between two communication parties.
链路检测操作。本操作仅适用于通信双方采用长连接通信方式时用于保持连接。
-
When there are not data being transmitted on the channel, both sides shall send link test packets every time interval C to maintain the connection.
当信道上没有数据传输时,通信双方应每隔时间C发送链路检测包以维持此连接。