-
Total Balance Time: the total of the sub work item's Balance Time and its own Balance Time - the Balance Time is the actual value, and no utilization rate considered.
总共的平衡时间:子工作项的总平衡时间及其平衡时间—平衡时间是实际的值,不会考虑使用频率。
-
The Duration column lists the time the element itself took to load, while the Total Duration column shows how long all the sub elements took.
Duration 栏列出装载元素本身所用的时间,Total Duration 栏列出所有子元素所用的时间。
-
For the main contractors in the construction business who sub-contract work to others, the turnover shall be the balance of the total contract sum less the payments made to the sub - contractors.
建筑业的总承包人将工程分包或者转包给他人的,以工程的全部承包额减去付给分包人或者转包人的价款后的余额为营业额。
-
The following sections details some typical examples using sub-capacity licensing and the total number of processors that would need to be licensed.
下面的小节给出一些详细的典型例子,演示随需添加许可的使用和需要为之授权许可的处理器总数。
-
Perpetual shopping carts display the number of items in the cart and sub-total as a shopper navigates the site.
永久购物车作为网站的一个导航展示在消费者购物车里的商品数量,并提供总价。