This is your planning horizon.
这就是你的规划周期。
-
Add all the primary ATP days within the planning horizon to the ATP days.
为atp日期,在规划周期内,添加所有主要的AT P日期。
-
Past the planning horizon, lay out the project at a higher level, reflecting the increased level of uncertainty.
规划周期完成后,进行高层次项目设计,考虑所增加的不确定性。
-
Planning horizon — the time period over which the benefit and costs are considered in time-related decisions.
计划界限——收益和成本被考虑进时间关系的决定中。
-
The `planning horizon' is how far to plan forward, and is determined by how far ahead demand is known and by the lead times through the operation.
后者是计划到什么时间,是由已知需求和生产中订货至交货的时间所决定的。