-
Timetabling is also called the scheduling problem.
排课表问题又称时间表问题。
-
A scheduling problem with rejection has been researched.
研究了工件可拒绝排序问题。
-
The DAG scheduling problem has shown to be NP complete in general.
一般情况下,这种DAG调度是个NP完全问题。
-
The boiler steam system cyclic scheduling problem was investigated.
对锅炉蒸汽系统循环调度问题进行了研究。
-
The performance measure of the scheduling problem is schedule length.
排序问题的性能测度是排序长度。